skip header   hitachi.com   hitachi.us    Global
Hitachi Global Storage Technologies
 
DK512C Jumper Plug Installation  
Terminator power on/off jumper (JP3 Bit 2^0)
Bit 2^0
: +5V source for terminator is supplied from the SCSI bus or the controller.

: +5V source for terminator is supplied only from the controller. (at the shipment)

Note 1:
0 : Jumper plug installed.
1 : No jumper plug installed.
Note 2:
Terminator power source is supplied to the terminator register module from the host that pulls up the SCSI interface signals in the controller so that the SCSI bus lines will not be pulled down when DK512C power is turned down.

Fig. 2-9 Terminator Power Supply Option

SG901 PCB Jumper Location

 






  Terms of Use | Privacy Policy | Contact Us  © 2008 Hitachi Global Storage Technologies